Thursday, June 10, 2010

LONG BEACH CONSTRUCTION UPDATE

They continue to make fast work of Long Beach. The scaffolding should come down soon and will get a real look at the building. But, until then here are some current photos: The stucco has been installed all over the building
The stair tower has been painted
The first of the metal siding has gone up The courtyard has been cleaned up and is waiting for the metal siding to be installedSome of the cabinets have started to be installed

No comments: