Numerous tranches carry drain pipes that will take access perimeter water and drain it to the sump pump pit
Friday, July 27, 2012
Tuesday, July 17, 2012
The Serrano - Shotcrete walls almost done!
Shotcrete wall are in as well as the concrete columns in the subterranean parking garage. Stair #2 shaft in the back corner
Tuesday, July 3, 2012
The Serrano - Rebar being installed
Waterproofing is installed and secured in place. The rebar is installed in a solid grid, making sure that each rebar intersection is securely tied...so tight that several men can walk on it!!!