Shotcrete wall are in as well as the concrete columns in the subterranean parking garage. Stair #2 shaft in the back corner
North subterranean parking garage wall
Looking down the vehicular ramp. Ready for more shotcrete! The west wall (in the back) is almost done
Stepped footing with drain pipes at the vehicular ramp. We need to make sure that rebar is tied tight and stiff enough before shotcrete work can begin
Looking at Stair #1 shaft to the left and Storage Room to the right